Armenian government changes rules for mining on land owned by individuals and legal entities
Number
N 1602-Ն
Type
Decision
Document type
Primary act
Status
In force (06.11.2026–present)
Source
Unified website 2026.10.26-2026.11.08 Date of official publication 05.11.2026
Adopting body
Government of the Republic of Armenia
Date of adoption
05.11.2026
Place of adoption
Yerevan
Signing body
Prime Minister of the Republic of Armenia
Date of signing
05.11.2026
Date of entry into force
06.11.2026
GOVERNMENT OF THE REPUBLIC OF ARMENIA
DECISION
November 5, 2026, No. 1602-Ն
ON MAKING AMENDMENTS TO DECISION No. 152-Ն OF THE GOVERNMENT OF THE REPUBLIC OF ARMENIA OF FEBRUARY 21, 2013
Pursuant to Articles 33 and 34 of the Law “On Normative Legal Acts,” the Government of the Republic of Armenia decides:
1. The following amendments shall be made to Decision No. 152-Ն of the Government of the Republic of Armenia of February 21, 2013, “On establishing the procedure for subsoil use within the boundaries of land plots owned by legal persons and citizens and declaring invalid Decision No. 1932-Ն of the Government of the Republic of Armenia of November 13, 2003” (hereinafter, the Decision):
1) the title of the Decision shall be worded as follows:
“ON ESTABLISHING THE PROCEDURE FOR SUBSOIL USE WITHIN THE BOUNDARIES OF LAND PLOTS OWNED BY LEGAL AND NATURAL PERSONS.”
2) in point 1 of the Decision, the words “persons and citizens” shall be replaced with the words “and natural persons”;
3) in the Appendix to the Decision:
a. in the title, the words “PERSONS AND CITIZENS” shall be replaced with the words “and natural persons”;
b. in points 1 and 2, the words “persons and citizens” shall be replaced with the words “and natural persons”;
c. point 3 shall be worded as follows:
“3. Legal and natural persons may, without obtaining a subsoil use right, carry out the following activities for the extraction of non-metallic minerals not recorded on the state balance sheet within the boundaries of their own land plots, in accordance with points 5 and 6 of this Appendix, having notified the authorized body, and without using drilling and blasting operations:
1) solely for the purpose of meeting their own economic and household needs, without pursuing profit, to a depth of up to two meters, as well as construction of underground structures to a depth of up to five meters;
2) extraction of solid non-metallic minerals for profit, in a volume of no more than 20 cubic meters during a calendar year;
3) extraction of solid non-metallic minerals for profit, in the case of construction of apartment buildings and public buildings, to the depth indicated in the design documents approved in accordance with the procedure established by law.”;
d. point 4 shall be worded as follows:
“4. Permits for the extraction of minerals, as well as for geological exploration for the purpose of extracting minerals, are not required for carrying out the activities provided for in point 3 of this Procedure, and the legal and natural persons carrying out the said activities shall not pay subsoil use fees in the cases specified in subpoint 1 of part 1 of Article 62 of the RA Subsoil Code.”;
e. point 5 shall be worded as follows:
“5. The activities provided for in point 3 of this Procedure may be carried out by legal and natural persons who have notified the authorized body thereof in writing, in accordance with the procedure established by the legislation of the Republic of Armenia, indicating the cadastral code of the land plot, the name of the mineral, and the purpose and volumes of its extraction.”;
f. point 6 shall be worded as follows:
“6. A copy of the document certifying ownership of the land plot shall be submitted with the letter, and, in the case provided for in subpoint 3 of point 3 of this Procedure, also the relevant section of the design documents approved in accordance with the procedure established by law, which will make it possible to identify the purpose of the facility under construction, the location of the earthworks, the plan boundaries, depth and design volumes, as well as a copy of the construction permit, if a construction permit is required by law for the construction of the given facility.”;
g. point 7 shall be worded as follows:
“7. After registering the letter, the authorized body shall notify the applying legal or natural person thereof within three days, in accordance with the procedure established by law, and within the same period shall provide the RA Environmental Protection and Mining Inspection Body with the information provided for in point 5 of this Procedure, and, in the case provided for in subpoint 3 of point 3 of this Procedure, also the relevant documents provided for in point 6 of this Procedure.”;
h. in points 8, 9 and 10, the words “persons and citizens” shall be replaced with the words “and natural persons.”
2. This Decision shall enter into force on the day following its official publication.
Prime Minister of the
Republic of Armenia
N. Pashinyan
Yerevan
05.11.2026
CERTIFIED
WITH AN ELECTRONIC
SIGNATURE
Date of official publication: November 5, 2026.
More from this selection
- Pashinyan attends Prime Minister’s Cup school swimming finals in Tsaghkadzor
- Avinyan discusses a Victory Park memorial to Albert Hovhannisyan and other fallen heroes
- Social aid for border communities set to continue until January 1, 2028