Government updates risk criteria for transport and construction inspections
Number
N 1636-Ն
Type
Decision
Document type
Principal act
Status
In force (13.11.2026-present)
Source
Unified website 2026.11.09-2026.11.22 Date of official publication 12.11.2026
Adopting authority
Government of the Republic of Armenia
Date of adoption
12.11.2026
Place of adoption
Yerevan
Signing authority
Deputy Prime Minister of the Republic of Armenia
Date of signing
12.11.2026
Effective date
13.11.2026
GOVERNMENT OF THE REPUBLIC OF ARMENIA
DECISION
November 12, 2026, N 1636-Ն
ON MAKING AMENDMENTS TO DECISION N 1697-Ն OF THE GOVERNMENT OF THE REPUBLIC OF ARMENIA OF NOVEMBER 28, 2019
Pursuant to Article 33 and Part 1 of Article 34 of the Law “On Normative Legal Acts”, the Government of the Republic of Armenia decides:
1. In the Appendix approved by point 1 of Decision N 1697-Ն of the Government of the Republic of Armenia of November 28, 2019, “On approving the methodology for risk-based inspections carried out by the Urban Development, Technical and Fire Safety Inspectorate of the Republic of Armenia and the general description of the criteria determining risk, and repealing a number of decisions of the Government of the Republic of Armenia”, (hereinafter referred to as the Appendix), make the following amendments:
1) Chapter 3 of the Appendix shall be set out as follows:
“III. RISK ASSESSMENT OF THE ACTIVITIES OF BUSINESS ENTITIES IN THE TRANSPORT SECTOR
9. The sectoral risk of a business entity has been calculated by a working group established for that purpose by the inspection body, taking into account the hazards present in each sector, their possible consequences in terms of severity, and the probability of the hazard occurring.
Table N 1
Type of activity
Score
Installation of gas-cylinder equipment and
periodic certification of gas cylinders
50
Technical inspection
40
Regular passenger transportation by buses
30
10. The individual risk of a business entity is assessed on the basis of the sum of the score obtained using the criteria characterizing the activities of the business entity (the first component of individual risk), whose maximum possible value is 50, and the risk score assessed using checklists (the second component of individual risk), where:
1) for a business entity carrying out regular passenger transportation, the first component of individual risk is determined by the sum of the scores indicated in Table N 2.
Table N 2
Criteria
Buses (points)
4
6
8
10
12
14
18
1.
Number of
motor vehicles
up to 5
5-14
15-19
20-29
30-34
35-39
more than 39
2.
Average age of motor vehicles
up to 1 year
1-2
years inclusive
2-3
years inclusive
3-4
years inclusive
4-5
years inclusive
5-6
years inclusive
more than 6
3.
Average daily mileage
of motor vehicles
up to 154 km
154-169
km
170-185 km
186-201 km
202-217
km
more than 217 km
2) for facilities belonging to business entities carrying out technical inspections of vehicles, the first component of individual risk is calculated as the sum of the scores in Tables NN 3 and 3.1, depending on the type and number of inspection lines at the technical inspection station and the average number of technical inspections carried out on one line during the last year.
Table N 3
Type of inspection line
1 line
2 or more lines
Universal inspection line
15 points
10 points
Inspection line for light vehicles
25 points
20 points
Table N 3.1
Points
5
9
13
17
21
25
Average number of technical inspections per line
up to 2000
2000-
3999
4000-
5999
6000-
7999
8000-
9999
10000 and
more
3) if the number of vehicles that underwent technical inspection during the last year and did not meet the technical inspection requirements exceeds 10 percent of the total number of vehicles that underwent technical inspection, 10 points are deducted from the risk score; and if the said number constitutes 5-10 percent of the total number of vehicles that underwent technical inspection, inclusive, 5 points are deducted.
4) for business entities carrying out activities involving the installation of gas-cylinder equipment and/or periodic certification of gas cylinders, depending on the licence annex and the number of installations and periodic certifications performed by the business entities during the preceding 6 months, the first component of individual risk is calculated in accordance with Table N 3.2.
Table N 3.2
Points
5
10
15
20
25
30
1.
Number of gas-cylinder equipment installations
up to 100
100-199
inclusive
200-299
inclusive
300 and
more
2.
Number of periodic certifications of gas cylinders
up to 1000
1000-1999
inclusive
2000-2999
inclusive
3000-3999
inclusive
4000 and
more
5) if the business entity carries out activities under two licence annexes, the risk is calculated as the sum of the maximum scores obtained.
6) the risk score assessed on the basis of checklists (the corresponding checklist component of individual risk is calculated on the basis of the scores obtained as a result of inspections using the checklists). The individual risk score for the checklist component (Rստ) is determined by the following formula:
where n1 is the value of the sum of the weights obtained from the answers to the control questions, and n is the maximum possible value of the sum of the weights obtained from the answers to the control questions. The maximum possible score for the second component of individual risk is 100.”
2) In paragraph 15 of the Appendix, replace the words “being modernized, demolished, reconstructed” with the words “being modernized, repaired, constructed, demolished, reconstructed, restored, strengthened, expanded”.
3) In subparagraph 1 of paragraph 17 of the Appendix, set out the last row of Table N 14 as follows:
“
Type of construction work
modernization, repair
construction, demolition
reconstruction, restoration, strengthening, expansion
”.
2. This Decision shall enter into force on the day following its official publication.
Deputy Prime Minister
of the Republic of Armenia
M. Grigoryan
Yerevan
12.11.2026
AUTHENTICATED
BY ELECTRONIC
SIGNATURE
Date of official publication: 12 November 2026.
More from this selection
- Pashinyan attends Prime Minister’s Cup school swimming finals in Tsaghkadzor
- Avinyan discusses a Victory Park memorial to Albert Hovhannisyan and other fallen heroes
- Social aid for border communities set to continue until January 1, 2028